Waiyaki Way: Uthiru–Ndumbuini interchange closures from 2 December. Your diversion, by direction
Two months of works at Lower Kabete, Ndumbuini and Uthiru, right through the holiday rush. Every diversion, set out by direction.

If you use Waiyaki Way around Kabete, Ndumbuini or Uthiru, plan for two months of changes. From Wednesday 2 December to about 31 January, KeNHA is rebuilding the ramps, loops and slip roads at the Lower Kabete–Ndumbuini/Kapenguria Road–Uthiru Interchange, and several access points will close.

Your diversion, by direction
| Going | Use this |
|---|---|
| Nairobi → Ndumbuini | Exit at Kabete Technical or Leadway Petrol Station, go through the Uthiru Underpass, rejoin towards Nairobi and turn into Marigioni Cabro Road. Or exit at the 87/Muhuri Interchange (just after Shell Kinoo) and take 87–Ndumbuini Road by 87 Mall. |
| Rironi / Nakuru → Ndumbuini | Turn at Muhuri Interchange and take Muhuri–Ndumbuini Road |
| Ndumbuini → Nairobi | Marigioni Cabro Road, or Ndumbuini Road via 87/Muhuri to Waiyaki Way |
| Ndumbuini → Rironi | The Nakuru-bound carriageway |
| Uthiru / Kawangware | Uthiru Underpass or Muhuri Interchange |
Why it's worth the pain
Right now, local traffic turning in and out of Ndumbuini and Uthiru cuts across fast highway traffic. The rebuilt interchange separates the two, which KeNHA says will remove risky turns across oncoming lanes.
Read alsoNo water in Kiambu? Why Athi Water switched off 72 million litres a day, and who's affected3 min readTips
- It overlaps with December holiday traffic heading upcountry. Leave early, especially on Fridays.
- Follow the temporary signs and the traffic marshals. They'll change as the work moves.
- Matatu routes and stages near Uthiru may shift, so ask your driver.
Heading further west for Christmas? See Rironi–Naivasha before Christmas.
Frequently asked questions
When do the Waiyaki Way Uthiru closures start?
Wednesday 2 December 2026, running for about two months, to around 31 January.
How do I get from Nairobi to Ndumbuini during the works?
Exit at Kabete Technical or Leadway, use the Uthiru Underpass and Marigioni Cabro Road, or exit at 87/Muhuri Interchange and use 87–Ndumbuini Road.
Why is KeNHA rebuilding the Uthiru interchange?
To separate highway traffic from local turning traffic and remove risky turns across oncoming lanes.
- Update Trending in Kenya today, 28 November 2026: fake football trials, NTSA's new app, and no water in Kiambu
- New Trending in Kenya today, 28 November 2026: fake football trials, NTSA's new app, and no water in Kiambu
- Update Shakahola: Paul Mackenzie jailed for 200 years over 191 deaths. What the sentence means
- Update Martha Karua is running for president: who's in the 2027 race so far, and the fight for Mount Kenya
- Update State House wants KSh8.4 billion more: what's in the request, and who decides






